Garden Storage Shed, 7 x 12 ft (213 x 366 cm), High-Density Polyethylene (HDPE), Steel-Reinforced Apex Roof

(10 customer reviews)

£499.00

Size Name

8 x 15 ft

,

8 x 20 ft

,

7 x 7 ft Deluxe

,

8 x 12.5 ft – Rough Cut

,

7 x 9.5 ft

,

8 x 10 ft

,

7 x 9.5 ft – Rough Cut

,

8 x 12.5 ft

,

7 x 12 ft.

,

8 x 7.5 ft

,

11 x 21 ft

Item Dimensions D x W x H

3.54D x 2.07W x 2.28H metres

Item Weight

190 Kilograms

Floor Area

6.94 Square Meters

Door Width

137.7 Centimetres

Door Height

191.7 Centimetres

Chamber Depth

353.8 Centimetres

Colour

Tan

Style Name

7 x 12 ft Apex Shed

Door Style

French Doors

Water Resistance Level

Water Resistant

Weight Capacity Maximum

2268 Kilograms

Ultraviolet Light Protection

Yes

Is Assembly Required?

Yes

Material Type

Alloy Steel, High Density Polyethylene

Base Material

High Density Polyethylene (HDPE)

Top Material Type

Polyethylene

Frame Material

Alloy Steel

Manufacturer Warranty Description

10-Year Limited Warranty

UPC

081483815459

Global Trade Identification Number

00081483815459

Manufacturer Part Number

60282

Model Number

60282

Unit Count

1.0 Count

Item Type Name

Outdoor Storage Shed

Best Sellers Rank

22,922 in Garden (See Top 100 in Garden) 71 in Garden Sheds

ASIN

B07K8GSBTQ

Feature

Slider Latch Locking System with Padlock Loops (Lock not Included)

19 People watching this product now!
SKU: B07K8GSBTQ Category:
Description

7 x 12 ft Garden Storage Shed – Heavy-Duty HDPE Outdoor Shed with Steel-Reinforced Apex Roof

The 7 x 12 ft Garden Storage Shed offers a large and durable solution for storing tools, equipment, and outdoor essentials. Built from high-density polyethylene (HDPE) with a steel-reinforced apex roof, this shed provides superior strength, stability, and long-lasting performance.

Designed for all-weather use, it is UV-resistant, weatherproof, and maintenance-free, ensuring your belongings stay protected year-round. Its spacious interior makes it ideal for larger gardens and heavy-duty storage needs.


🔑 Key Highlights

  • Large 7 x 12 ft storage capacity
  • Strong HDPE construction for durability
  • Steel-reinforced apex roof for extra strength
  • Weatherproof & UV-resistant
  • Maintenance-free (no rust, rot, or peeling)
  • Ideal for tools, equipment & outdoor storage

📏 Dimensions

  • Size: 213 x 366 cm (7 x 12 ft)
1
Impact resistant
Structural integrity
Surface Prep
Reviews (10)

10 reviews for Garden Storage Shed, 7 x 12 ft (213 x 366 cm), High-Density Polyethylene (HDPE), Steel-Reinforced Apex Roof

  1. no delivery again

    5.0 out of 5 stars

    It seems like a good quality shed

    Excellent shed. The price fluctuates wildly, it could double overnight only to go down £500 the next day. The windows can be placed on any side. It seems sturdy enough once its put together as long as you get it put together the way it should be, the instructions are mainly good but you might as well throw them away when you get to the skylight part. Between the 2 windows and the skylight it makes it very light.

    7 people found this helpful

  2. Tech Gurl

    4.0 out of 5 stars

    Better than Keter

    Good shedAesthetics: Looks as good as photos.Design: Until constructing wld not have realised it would be better design to have the windows in the door, after all light is needed but not to waste wall space for windows and when door is closed you cannot see if someone is in front of door when opening.Shelving: l didn’t find the provided long shelf useful as you can only fix it into certain positions into the struts. I’m using garage rack shelving. The corner shelves are useful near the door. 180 high racks fit around the struts.Gutter: gutter chanel’s are build into the roof struts, interesting design.The roof light: Others seem to have had problems, ours fit perfectly, maybe they were not positioning it correctly. I’ve added a magnetic COB light but in day time plenty of natural lighting with roof light and window. You cld add a solar light with PIR.Window: Perspex, I won’t be opening mine, there will be enough ventilation when required with doors open. I will be applying privacy film to mine. I fitted both windows to same wall rather than opposite sides.Construction: level base necessary, ours was block paving which was laid by us for the shed without special tools. Managed to put the shed together but when putting roof on and attaching at back last 2 roof panels were bit troublesome to line up, needed to loosen and retighten few joining pieces and hold in. I’m pretty sure if it were not for fact my friend has a lot of experience putting things together we wld have gotten stuck. Took us 1.5 days to construct. 1 person who knew what to do the other (me, the little woman) holding stuff and occasionally being blamed for not being competent 😂. Did have to watch some of the videos back and forward few times here and there. The roof clips were a modified design to video but I think bit easier.Floor: seems ok but we laid rubber matting down to provide additional insulation against cold from base.Waterproof: Plenty of rain since construction and everything inside is dry.Value for money: I felt it was a bit expensive but I think a wooden shed would not last anywhere near as long so acceptable.Compared to a wood shed: For a more novice person at least you can screw things into a wood shed to hold it together if things not exactly lined up. Did need a bit more patience and more level floor for a plastic one.Instructions: booklet and step by step videos were good. I’d allow 2 days.Lockability: Don’t buy a padlock till you see the ring, a medium rather than large padlock works, a very heavy duty large one will not fit.Thickness: This is a premium brand shed, I think better than Keter. I read many reviews of other sheds before I selected this company’s shed.Storage Capacity: this is a medium sized shed, I’ve added 4 shelf racks 3 of 180x90x40 and 1 of 150x80x30, there is space still for floor standing lawn mower and other items as well and boxed items stacked.Biggest difficulty: getting the screws out of the packets was bit difficult 😂 be careful with Stanley knife!!Overall very happy with the shed.1 star deducted for window not in door design and terrible screw packaging.

    4 people found this helpful

  3. Lolly

    5.0 out of 5 stars

    Great shed

    Absolutely beautiful shed, great quality, look amazing. Highly recommended.Thank you

  4. km

    5.0 out of 5 stars

    Great, strong and worth the money.

    Arrives in two very large boxes, they are painfully heavy. But this is what makes it a great shed.Steel inserts keep it strong.Best shed I’ve ever bought. Super strong, easy to build (well, my builder said it was easy to build)… and it fits stuff in it like it should. Price fluctuates, if you can get it around 600/700 it is worth every penny.

    16 people found this helpful

  5. BlithespiritBlithespirit

    5.0 out of 5 stars

    Great shed, very satisfied. Adds that little extra to a “shed”

    Love this shed, it took me 5 hours on my own to put up, the instructions are great if you take your time, no surprises or extra holes needed to be drilled and the thinking behind things like rain flow from the roof etc I cannot fault. A few things for people buying this, you need a good base to start, while your putting the sides up use a rubber hammer to slide the panels across. Don’t rush. Like any shed this is not 100% stable until it’s finished. As you put the panels around the side push/pull the new panel until it lines up before putting your screws in. Don’t rush, when your putting panels on and they just don’t quite fit, start at one side in screw hole one, then move to two, then three etc etc…… if you do this it will pull your parts in and line them up. Not huge gaps but five to six mm. don’t rush. I am not a shed expert but I did find this simple to do, easy to follow instructions and very satisfied with the finish.

    78 people found this helpful

  6. Astrid lesley Critchley

    1.0 out of 5 stars

    very poor delivery

    very poor delivery, it has been delayed delayed delayed and still has not arrived, pretty poor performance for a very expensive item, would advise looking elsewhere.

    15 people found this helpful

  7. fee

    4.0 out of 5 stars

    7×11 shed

    Took a few hours to build. Make sure you have a good base, take time to read instructions. Good large shed went together well, the last piece the skylight or clear apex was a little trick. Happy with the overall product.

    One person found this helpful

  8. Tony Gregory

    5.0 out of 5 stars

    Very good shed

    Life time shed very good faulty part was sorted out with lifetime once I found the correct procedure to go down had a lot of problems with Amazon to put me in touch with life time i had to go straight to life time when i bought item with Amazon

    2 people found this helpful

  9. S

    3.0 out of 5 stars

    My First Experience with a Lifetime Shed.

    This is my first time owning a plastic/resin shed. Before purchasing, I spent several weeks researching various brands and reading countless reviews. Every time, Lifetime consistently stood out as the top-rated brand. I had a clear list of requirements, and although I was willing to spend a bit more for higher quality, I was pleased to find this particular model on special offer at the time.The shed was delivered in two very large, heavy boxes. I unpacked everything and carefully identified all the parts listed in the instructions. To make things easier, I sorted the pieces into categories: base, doors, walls, and roof. There’s a surprisingly large number of screws and fixings, but they’re all clearly labelled and correspond perfectly with each step in the manual.Speaking of the manual – it’s genuinely one of the best I’ve ever used. It’s extremely well-written and easy to follow. If you do find yourself stuck, it’s likely because you’ve missed something in the instructions. They even include QR codes linking to helpful assembly videos, which is a great touch.If you have basic DIY skills, you’ll manage fine. That said, I did need a second pair of hands for slotting in the wall panels and positioning the roof. Overall, it took me two days to complete the build. Once finished, the shed has a very clean and tidy appearance.However, I must admit to feeling a bit disappointed with the overall quality. If this is the best plastic shed on the market, I’d be concerned about what the cheaper ones are like. Maybe my expectations were a bit too high, but given the price point—even at a discount—I was hoping for something sturdier.Here are a few areas I felt let the product down:Wall panels: These could definitely be thicker and the corrugated finish on the inside makes the space feel less refined; a flat interior would be much more practical.Base: It’s functional, but nothing exceptional.Skylight design: This was the most frustrating part of the build. It felt like the designer took a holiday and left an apprentice in charge! It doesn’t align with the well-thought-out design of the rest of the shed. The skylight simply slots in without a secure locking mechanism, and it’s not clear where the screws should go. I ended up physically climbing on the roof to push it into place and had to reinforce it from the inside for peace of mind.Gaps and sealing: There were more small gaps than I was comfortable with, so I’ve had to spider-proof the shed.Flooring: I added a rubber gym floor mat over the base to make it feel more robust and comfortable to walk on.Final ThoughtsIn conclusion, the shed is fine – it looks good and I found it relatively easy to build. But I do feel it falls short of the premium expectations I had based on the brand reputation and the price. It’s not bad, but it’s not exceptional either. If you’re considering a plastic shed and go in with realistic expectations, this could still be a solid choice.

    8 people found this helpful

  10. mr jamie chappell

    4.0 out of 5 stars

    Lifetime plastic Shed

    Please note, this shed is curbside delivery only, and comes in 2 big and very heavy boxes. Unpack and check everything is present ASAP, as no missing parts can be provided by Amazon and the company- Lifetime, are based in America, I had one part missing, Amazon did offer a refund and return but couldn’t wait for another 2 weeks for the replacement.Preparation is key, ensure you have a flat base, or you will spend hours trying to pull this together, I purchased a plastic grid for it to sit on from Amazon, really easy to do.The skylight is a nightmare to put on, definitely at least 2 people needed as you need someone outside to push this down, whilst you screw into place inside.Now it’s up, I’m really happy with the purchase, although it’s taken a good 15 hours, best to take your time and get it right.I will never go back to a wooden shed again.

    3 people found this helpful

Add a review

Your email address will not be published. Required fields are marked *

What Sets Outside Store Apart
☑ Trustworthy and Knowledgeable Staff Available to Help You Find What You Need ☑ 30 Day Money Back Guarantee and Price Match Guarantee to Ensure Your Satisfaction ☑ Hundreds of Satisfied Customers who Trust Us and Rely on Our Quality Products and Services ☑ Secure Ordering with SSL encryption, Providing You with Peace of Mind While Shopping with Us Reasons to Buy From Us
Shipping and Delivery

MAECENAS IACULIS

Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.

ADIPISCING CONVALLIS BULUM

  • Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
  • Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
  • Diam parturient dictumst parturient scelerisque nibh lectus.

Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.